Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |
| No.13679054

- Product Categories
- XBD-L Vertical single-stage..
- XBD-W horizontal single sta..
- XBD- (I) vertical multistag..
- XBD-L Vertical Multistage F..
- ISG vertical pipeline centr..
- ISW horizontal pipeline cen..
- GDL series vertical multist..
- ZXL Direct-priming pump
- CYZ series of self-priming ..
- ZWL self-priming non-clog s..
- JYWQ series automatic stir ..
- JPWQ series automatic stir ..
- QW series non-clogging subm..
- WQ series submersible non-c..
- YW liquid formula under non..
- GW-type pipe-type non-clogg..
- LW type vertical non-cloggi..
- Friendly Links
- home > Supply > 200JYWQ250-22-30kw automatic stir sewage pump / submersible sewage pump warranty for one year
Information Name: | 200JYWQ250-22-30kw automatic stir sewage pump / submersible sewage pump warranty for one year |
Published: | 2015-06-11 |
Validity: | 180 |
Specifications: | 200JYWQ250-22-30 |
Quantity: | 10000.00 |
Price Description: | |
Detailed Product Description: | A, JYWQ automatic stir sewage pump Product Overview: JYWQ series automatic stir sewage pump on the basis of common type sewage pump automatic stir on the apparatus with the motor shaft, resulting in strong mixing power, sewage tanks sediment stir into suspension, discharge suction pump to improve the blockades, sewage capacity of the pump, once completed drainage, clean up, in addition to silt, to save operating costs, is obviously advanced and practical environmentally friendly products. Two, JYWQ automatic stir sewage pump Features: 1, the use of the water pressure pump itself, stir sewage sludge sedimentation tanks, to really be completely discharged purpose cesspool precipitate. 2, the flow channel anti-clogging design of hydraulic components, greatly improving the dirt capacity, can effectively through the pump five times the diameter of the fiber material and diameter of the pump diameter of about 50% solids. 3, reasonable design, supporting reasonable motor, high efficiency, energy saving effect is remarkable. 4, mechanical seal is double tandem seal, made of corrosion-resistant tungsten carbide hard, durable, wear-resistant, can pump more than 8000 hours continuous operation safety. 5, compact pump structure, small size, easy to move, easy to install, no need to build pumping stations, dive into the water to work to reduce the project cost. 6, the oil chamber has a water probe, the pump implement absolute protection. 7, can be equipped with automatic security control cabinet, the pump leak, leakage, overload and overtemperature absolute protection, improve safety and reliability of the product. 8, the float switch may vary according to the desired level, automatic control of pump start stop, without special care. 9, the motor can be water-jacketed outer circulation cooling system to ensure safe operation of the pump without water (dry) state. 10, double rail automatic coupling installation system, to pump installation and maintenance bring great convenience, but this may not enter the sewage pit. 11, installation fixed automatic coupling installation and mobile installation of two kinds of freedom, to meet different usage scenarios. Three, JYWQ automatic stir sewage pump Application: 1. Factories, commercial seriously polluted wastewater discharge. 2. Urban sewage treatment plants, hospitals, hotels drainage system. 3. Residential sewage pumping station. 4. Air defense system, pumping station, water plant water supply system. 5. Municipal engineering and construction. 6. Exploration, mining, power plants, matching attached machine. 7. Rural biogas digesters, irrigation, dredging rivers and ponds. Four, JYWQ automatic stir sewage pump Note: (1) before running the application megger stator winding insulation resistance to ground, not less than 50 megohms minimum. (2) Check the cables for damage, breakage and so on. If damage must be replaced to avoid leakage; cable cross section should match the current. (3) the voltage exceeds ± 10% of rated voltage shall not start pumps. (4) in order to ensure safety, must be four-core cable ground wire grounded to prevent electric shock. (5) When the pump submerged, vertical lifting should not allow cross-lying land, but can not fall into the sludge. Stop using the pump should be lifted clean, dry place, and pay attention to antifreeze. (6) prohibit the use of the cable as an installation from the sling. (7) Check the rotor rotation direction, looking down from should rotate clockwise. (8) outdoor switch or terminals should be rain, moisture-proof measures, when wet hands or barefoot prohibited touch switch to prevent electric shock. (9) Move pump, must be cut off, pump runtime person shall contact with water, to prevent the occurrence of leakage accidents. (10) non-motor phase operation, such as found in a blown fuse, only after continued use should check the reason can not be any bold fuse. (11) when the pump is running, there should be someone administration, if there is an abnormal phenomenon should immediately stop inspection, troubleshooting. (Referring to the situation at the end of the cabinet with automatic protection). (12) pump in the working medium conditions specified normal operation after six months, you should check the oil chamber seal condition, such as an oil chamber of the oil milky or water precipitation, should be replaced 10 to the 20th machinery oil and mechanical seals. For pumps in harsh working conditions, but should always overhaul. (13) The user should select the appropriate flow head according to actual use conditions in order to achieve the best results, as shown in the pump nameplate or specification parameters for the optimal use of operating point, user-selectable in (0.7 to 1.2) optimal flow within the times used to prohibit the use of excess flow, or the amount of traffic, too easy to lift the motor overload. Service: 1, according to state regulations for electrical and mechanical products for one year warranty. During the warranty period, users will enjoy free services, paid services for life, long-term parts. 2. If the customer appears in the use of our products have any problem, we will offer you the following service: (1) the user used in case of any problems of our products, please call our service department, we quickly give response within two hours after notification received from users, to provide users with urgent solutions. (2) as a result of improper use or outside of the warranty period, causing damage or product does not work, the company will also provide maintenance services products, only charge for the cost of replacement parts. (3) We will build customer profiles manufactured products, the implementation of a machine a file management program, the customer service department will regularly track product usage, to ensure the normal operation of equipment; problem (4) customers using our products proposed We are committed to give a reply or resolved within six hours. |
Admin>>>
You are the 15080 visitor
Copyright © GuangDong ICP No. 10089450, Shanghai Jiang Yang Pump Manufacturing Co. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 15080 visitor
Copyright © GuangDong ICP No. 10089450, Shanghai Jiang Yang Pump Manufacturing Co. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility